塑胶运动地板的施工工艺 |
添加时间:2017/12/15 16:33:58 浏览次数: |
(一)地材施工前地面预检项目及标准
(a) material before the construction of ground pre project and standard
1)强度
1) strength
细石砼找平层(或水泥砂浆)强度等级大于C20,用硬度测试仪检测结果应是地坪表面硬度不低于1.2兆帕。细石砼找平层(或水泥砂浆)不得空鼓、裂缝、起砂。
The strength grade of the fine stone concrete leveling layer (or cement mortar) is greater than C20, and the hardness tester test result should be that the surface hardness of the floor is not less than 1.2 MPa. Fine stone concrete leveling layer (or cement mortar) not hollowing, cracks, sand.
2) 地面平整度
2) ground flatness
2m范围内高低误差在3mm内(2m长检测尺检测)。
In the range of 2m, the high and low errors are in the 3mm (2m long test ruler).
3) 干燥度
3) desiccation degree
施工前应确保地面干燥,砼或水泥砂浆找平层至少超过终凝养护期28天,使用CNN含水率测试仪检测基层的含水率应小于3%。
Before construction, we should ensure that the ground is dry, and the concrete or cement mortar leveling layer is at least 28 days longer than the final curing period. The moisture content of the base should be less than 3% by using the CNN moisture content tester.
4) 防水
4) waterproof
卫生间、洗涮间、开水间等可能长期接触水的部位,墙地面应做好防水层(防水层上墙高度不低于30cm)。卫生间、洗涮间、开水间等地面标高应低于其它部位地面标高3-5cm。底层楼面地坪,土建方(或装饰方)应做好防潮层。
Toilet, washing room, open water room and so on may contact the water for a long time, the wall surface should be well waterproof layer (the height of the waterproof layer wall is not less than 30cm). The ground elevation of toilet, washing room and open water room should be lower than the ground elevation of 3-5cm in other parts. The floor floor of the floor floor, the civil construction party (or the decorating party) should do well in the moisture-proof layer.
5) 与其它材料交界处的高差
5) the height difference at the junction of other materials
其它地面材料交界处(地毯、大理石、木地板、地砖等)高差应在负4-6mm之内。亚麻油地材铺设前门扇底至地面留缝H≥10mm。
The height difference between other ground material (carpet, marble, wood floor, floor tile, etc.) should be within the negative 4-6mm. Linseed oil and wood laying the front door to the ground below the fan seam H = 10mm.
6) 交叉施工
6) cross construction
地材施工禁止交叉施工。地材进场施工,应安排在所有前期工序均已完工退场后进行或最后涂装前进行。
Cross construction is forbidden in the construction of ground material. The construction of ground material should be arranged before all previous procedures have been completed or before finishing.
7) 施工工期
7) construction period
地材施工,每道工序都有一定的养护期,且后期施工较精细。为保证施工质量,必须保证足够施工工期。
The construction of ground material has a certain maintenance period in each process, and the later construction is more fine. In order to guarantee the quality of construction, the construction period must be guaranteed.
(二)基层处理:地坪打磨清洁
(two) grass-roots treatment: floor grinding and cleaning
砼地面在铺设地板之前,必须用砂浆C15提前28天-35天找平,找平高度比地面设计高度低5mm,找平层表面应为光面。基础地面需干净,无油脂和脱模剂,找平层必须有足够的承载力,不能有裂缝、空鼓和起砂现象。施工期间应保持所有需铺设亚麻油地板的地面干燥。与其它材料连接的地方,其他地面需先安装好,做到好接边的处理,以保证接口的平整。地板的施工通常在内装最后的工序进行,避免交叉施工。
Before laying the floor, the concrete ground must be leveled with the mortar C15 28 days -35 days ahead of time, and the leveling height is 5mm lower than the ground design, and the surface of the leveling layer should be light surface. Based on the ground need to clean, no grease and demoulding agent, leveling layer must have sufficient bearing capacity, can not have cracks, hollowing and sanding. During the construction period, the ground should be kept dry for all the floor of the linen oil. Where the other materials are connected, the other ground needs to be installed first, so that the edge can be handled well to ensure the smooth interface. The construction of the floor is usually carried out in the final process of internal loading to avoid cross construction. |